Long Creek high school

Home | Residential

PROJECT DETAILS

Long Creek high school

Builder:
Project Completed: 2024
Location: New Braunfels, Tx
Project Details: 198 drilled piers project with 3" concrete underfloor Mudslab, 40,165 SF elevated slab foundation with concrete columns up to 3rd floor, Perimeter retaining wall up to 30’ in height, Site includes curbs, Paving, sidewalks, V swales and outfall structures

Let’s Talk

Imagine the Possibilities